Perma – Pipe
Factory, Fujairah, U.A.E
Needs
Assessment Study was carried out to set up a Factory
at Fujairah in U.A.E. for PERMA - PIPE
MIDDLE EAST, a wholly owned subsidiary of Perma-Pipe
Inc. –the largest manufacturer of pre-insulated
piping system in North America, to serve the Projects
all through Middle East and North Africa (MENA)
as well as parts of Asia.
The project entailed
the transferring of process equipment and technology of the
pipe factory located in Lebanon Tennessee USA
to Fujairah UAE. This 4 Million Dollar plant was detailed, designed
and brought into operation based on the Engineering carried out
by Green Technologies. The work entailed a factory visit to the
plant in USA to determine the operational requirements and implementing
same here in the UAE.
One of the tasks that is noteworthy of stating is the use US
based equipment in The UAE, which required the use of step down
transformers to accommodate the 110 Volt 60 Hz equipment to operate
on 400 Volt 3 Ph 50hz electrify supply.
The facility involves
four production lines, Office & Workers
Facilities, Utility areas for Transformer and Switchgears, HVAC
Systems, Compressed Air System, Cooling Tower/Cooling Water System
and Warehouse |