Replacement
of Chiller Plant – Hyatt Regency Dubai & Galleria
The
Hyatt Regency and Galleria, commissioned the services
of ServeU under the management of a LEEDTM Accredited
Professional, to Engineer and Project Manage the
retrofit of the 5000 Ton Chiller Plant. Green Technologies provided the services of the
LEEDTM Accredited Professional, for Engineering,
Energy Modeling and Project Management, from concept
to completion. The project involved the replacement of the 23
year old chiller plant, without disrupting the
operations of the hotel.
The retrofit included
- 5000 Tons of Centrifugal Chillers
- 6000 Tons of Cooling Towers
- Condenser water Pumps.
New equipment included
-
Chiller Plant Manager
- Variable Speed Chillers
- Variable Flow Primary Pumping
- Chiller Plant Manager
|
|
Project Highlights
- No disruption to hotel operations
- Completed on time & on budget
- Moving of 400,000 Tons of equipment in an operating hotel.
- Fully Automated Chiller Plant with Energy and Water
Management Capabilities |
|
 |
 |
|
Project
Title:
Replacement of Chiller Plant – Hyatt
Regency Dubai & Galleria
Client:
Hyatt
Regency Dubai & Galleria
Engineers
and Project Managers:
Green Technologies FZCO
Scope
of work Includes
-
Feasibility Study on the replacement of the 5000 Ton Centrifugal
Chiller Plant.
- Refrigerant Application and Energy Study R500,
R134, R 123.
- Energy Modeling Chiller Power and Water Use, based on DOE 2.1 E Energy
Modeling Software.
- Life Cycle Analysis, including Value Engineering.
- Detailed Design, Replacement Methodology, and Contract Documents.
- Project Management from Concept To Completion.
- Post contact Energy and Water Management. |
|